Akuntansi
TRAINING ONLINE PROJECT INSURANCE CONTRACTOR ALL RISK

TRAINING ONLINE PROJECT INSURANCE CONTRACTOR ALL RISK

TRAINING ONLINE PROJECT INSURANCE CONTRACTOR ALL RISK

TRAINING WEBINAR PENGENALAN PROJECT INSURANCE CONTRACTOR ALL RISK

TRAINING PROYEK ASURANSI KONTRAKTOR UNTUK PRAKERJA

penerapan Project Insurance Contractor All Risk Training

pelatihan Project Insurance Contractor All Risk Training online

 

 

Banking 1 Comment pelatihan pengenalan Project Insurance Contractor All Risk Training online

Any works cannot always be released with the risk, as well as with the

construction  project work. There are a variety of ways to handle risk

in  construction  project  works,  one of which is by using insurance.

Insurance  is  one  of  the  key  elements  that  support  the  smooth

construction projects.

 

Project  insurance is known as an insurance that guarantees any damage

or  loss  caused  material  damage  and  third  party liability during

construction)  or  at  the time of installation (erection), as well as

damage to or loss of machinery or electronic equipment.

 

Contractor’s  all-risk  insurance  is  insurance  sold to construction

contractors  operating  outside  of  the  United  States. It typically

contains  three  parts.  The first is very similar to a builder’s risk

policy sold in the U.S. A second part covers liability for third-party

bodily  injury or property damage arising from construction. The third

part  covers losses stemming from delay of construction and is usually

optional, according to the International Risk Management Institute.

 

OUTLINE pelatihan proyek asuransi kontraktor online

 

  1. Development  of  Engineering  Insurance  and Relevant Legislation:

Historical background

  1. Classes  of  Business,  Special  Characteristics,  Principles  and

Practices of Engineering Insurance: Construction Phase Insurances

  1. Types  of Plant, Machinery, Equipment & Associated Hazards: Plant,

machinery &equipment commonly found in all types of industries

  1. The Project stages, The Works Contract & Other contracts
  2. Construction Phase Insurances
  3. Contractor’s All risks Insurance
  4. Erection All Risks Insurance
  5. Contract Works Insurance (CW)
  6. Contractor’s Plant & Machinery Insurance
  7. Advance Loss of Profits (ALOP) / Delay in Start
  8. Endorsements including Supplementary Covers & Information required

for framing Construction Phase Insurance Program for project.

  1. Operational Phase Insurances
  2. Machinery Insurance, Boiler & Pressure Plant Insurance
  3. Electronic Equipment Insurance:
  4. Other  Annual  Policies: Deterioration of Stocks (DOS) Potatoes &

others

  1. Risk  Management,  Risk  Inspections  &  Loss  Prevention:  Risk

management

  1. Special  Types  of  Engineering Insurance Covers in International

Markets

 

-Comprehensive Project Insurance (CPI)

-Comprehensive Machinery Insurance (CMI)

-Construction Annual Floaters

-Machinery Leasing insurance

-Aero engine breakdown

 

WHO SHOULD ATTEND pelatihan penerapan Project Insurance Contractor All Risk Training online

Insurance  Project  Managers  &  Officer,  Risk Managers and officers,

Insurance Risk Administrators, Finance staff.

 

 

Jadwal Pelatihan sinaran-training.com tahun 2023 training Project Insurance Contractor All Risk Training offline:

Batch 1 : 21 – 22 Januari 2026

Batch 2 : 8 – 9 Februari 2023

Batch 3 : 11 – 12 Maret 2026

Batch 4 : 22 – 23 April 2026

Batch 5 : 6 – 7 Mei 2026

Batch 6 : 10 – 11 Juni 2026

Batch 7 : 15 – 16 Juli 2026

Batch 8 : 12 – 13 Agustus 2026

Batch 9 : 23 – 24 September 2026

Batch 10 : 14 – 15 Oktober 2026

Batch 11 : 11 – 12 November 2026

Batch 12 : 16 – 17 Desember 2026

Jadwal tersebut dapat disesuaikan dengan kebutuhan calon peserta

 

Lokasi Pelatihan Tahun 2023 training pengenalan Project Insurance Contractor All Risk Training offline :

Yogyakarta, Hotel Dafam Seturan(7.300.000 IDR / participant)

Jakarta, Hotel Amaris Tendean (7.900.000 IDR / participant)

Bandung, Hotel Golden Flower (7.800.000 IDR / participant)

Bali, Hotel Ibis Kuta (8.500.000 IDR / participant)

Lombok, Hotel Jayakarta (8.750.000 IDR / participant)

Catatan :

  • Waktu pelatihan Dua+1* hari dengan Biaya tersedia untuk Perorangan, Group, dan Inhouse Training, belum termasuk akomodasi/penginapan.
  • Untuk biaya dan jadwal training harap menghubungi marketing kembali

Investasi training training proyek asuransi kontraktor offline
:

Investasi pelatihan selama dua hari tersebut menyesuaikan dengan jumlah peserta (on call). *Please feel free to contact us.

Apabila perusahaan membutuhkan paket in house training, anggaran investasi pelatihan dapat menyesuaikan dengan anggaran perusahaan.

Fasilitas training training penerapan Project Insurance Contractor All Risk Training offline :

Free Penjemputan dari bandara ke hotel*.

Modul / Handout.

Flashdisk*.

Certificate of attendance.

FREE Bag or bagpacker.